Fermentation waste / residues

Below you can find a list of reference projects in the sector of fermentation waste / residues:

Biogas system with two gas turbines and biogas upgrading

Status: planned
Task: General planning, approval planning, tender procedure, construction supervision
Location: Höhenmölsen, OT Webau, Germany
Raw materials: 90 % slaughterhouse waste, 10 % old bread
Electrical Energy: 400 kW
Thermal Energy: 440 kW
Gas feed: 1.400 Nm3/h

Biogas plant with a CHP unit

Status: planned
Task: Conversion of Nawaro plant to liquid manure operation
Location: Tagewerben, Germany
Raw materials: 80 % liquid manure, 20 % solid manure
Electrical Energy: 500 kW
Thermal Energy: 550 kW

Expansion of a biogas plant by adding a gas feed installation

Built in: 2015/2016
Status: under construction
Task: General planning, approval planning, tender procedure, construction supervision
Location: Vettin, Germany
Raw materials: 55 % liquid manure (cattle slurry), 5 % cow dung and feed remains and 40 % maize silage
Gas feed: 1.400 Nm3/h

Biogas plant with a CHP unit

Built in: 2015
Status: in operation
Task: General planning, approval planning, tender procedure, construction supervision
Location: Teuchern, Germany
Raw materials: 80 % liquid and solid manure, 20 % renewable raw materials
Electrical Energy: 650 kW
Thermal Energy: 715 kW

Biogas plant with power generation via CHP and heat utilisation

Built in: 2012/2013
Status: in operation
Task: General planning, approval planning, tender procedure, construction supervision
Location: Vettin, Germany
Raw materials: 80 % liquid manure (cattle slurry), 10 % maize, 10 % other

Electrical Energy: 800 kW
Thermal Energy: 880 kW

Research facility

Built in: 2012
Status: in operation
Task: Piping design
Location: Leipzig, Germany